800G Fabric for AI Clusters

800G Fabric for AI Clusters

Powering the Next Generation of 800G AI & HPC Fabrics

The SND9820 is positioned as a next-generation 800G Ethernet platform based on Marvell Teralynx® 10. With 64 x 800G OSFP ports and 51.2 Tbps switching capacity, it is designed for high-bandwidth AI/ML clusters, HPC environments and hyperscale data center fabrics.

Key Highlights

ASIC
Based on Marvell Teralynx® 10
switching technology for next-generation
high-bandwidth Ethernet fabrics
Low Latency
Designed for high-throughput, low-latency
networking associated with distributed AI training
and HPC workloads
Switching Capacity
Delivers 51.2 Tbps switching capacity
for rapidly increasing AI, ML
and HPC bandwidth requirements
800G Ports
Provides 64 x 800G OSFP ports for extremely high-density
connectivity across large-scale data center fabrics
Applications
Target applications include AI/ML clusters,
HPC environments and
hyperscale data centers
Scalability
800G Ethernet connectivity supports
scalable architectures for AI
and machine learning clusters
Open Networking
Hardware switch pre-loaded with Open
Network Install Environment (ONIE)

Hardware Overview

Front View

Technical Specifications

Senao Data Center Switch
Model Name

800G Data Center Switch

Model Number

SND9820

Network Interfaces

64 x 800G OSFP

I/O / Management

Console: RJ45 RS232
OOB: 1 x GbE RJ45

Switching Capacity

51.2 Tbps

Management

Aspeed AST2600 (Edge SCM, Edge Secure Control Module)

Software

Hardware switch pre-loaded with Open Network Install Environment (ONIE)

Switching Silicon

Marvell Teralynx® 10

CPU / Processor

Intel® Xeon® Processor
Ice Lake-D SoC

Memory

4 x 16 GB DDR4 ECC SO-DIMM; up to 128 GB

Storage

128 GB M.2 SSD

TPM

TPM 2.0

Power

1+1 Redundant 3200W AC/DC CRPS

Applications

AI / ML clusters; HPC; hyperscale data centers

Product specifications, configurations, certifications, and availability are subject to change without notice and may vary by region and customer program. Final commitments are governed by the applicable quotation, statement of work, or executed agreement.

Ready to Build Your Infrastructure?

Our technical consultants will respond within one business day.